Introduction to the Case of Guangyangwan Shanhu Primary School and Middle School: Guangyangwan Shanhu Primary School covers an area of about 25.5 mu, with an enrollment scale of 24 classes and a total construction area of about 33,600 square meters; The middle school project covers an area of about 95.5 mu, with an enrollment scale of 60 classes and a total construction area of about 99,900 square meters; The project is located in the core area of the city, surrounded by land to be developed and built residential buildings and there is a large area of urban green space between the two plots. Due to large population, tight construction schedule and high quality standards, high requirements were put forward for the comprehensive control and coordination of quality, safety, construction period, and cost during the construction process. As the carrier of innovative technologies in the construction industry, BIM technology, combined with advanced technologies such as "big data, Internet, 5G, AI technology, AR/VR, IoT, cloud computing and cloud collaboration", will be used to guide this project to achieve the whole-process smart construction and smart decision-making. BIM collaboration platform is built and BIM technology is applied to effectively inspect, coordinate and optimize each stage of the project so as to improve project quality, ensure construction period, control costs, and provide technical support and solutions for project construction from the aspects of economy, rationality, and feasibility. The on-site monitoring data, tower crane data, access control system, personnel management system, dust monitoring system, etc. are integrated into the smart construction site platform of the project to realize the dynamic integration of BIM + smart construction site and complete dynamic real-time management of on-site digitalized construction site through the BIM smart construction site platform. In standard classrooms and dormitories, intelligent equipment such as ribbon board installation robot and indoor spraying robot are used to assist construction, improving building efficiency, reducing costs and ensuring construction quality.
Introduction of Yangtze River Ecological Civilization Cadre Academy: The Yangtze River Ecological Civilization Cadre Academy has a total construction area of 120,500 square meters and consists of three parts: area A (administrative office and exhibition), area B (comprehensive teaching and culture and sports) and area C (dormitory and dining hall), with a total of 38 single buildings, built according to the situation of the mountain. The entire process of this project uses BIM technology, and the benefits of some intelligent construction applications are as follows.
1. The project reduced drawing errors through BIM model creation and collision detection, etc., directly saving more than 10 days of construction time.
2. Through the platform-based collaborative design management, the project greatly improved the effectiveness of project communication and reduced the management and control costs and labor costs of the project.
3. BIM technology is used to simulate the layout of temporary facilities on the site, earthwork deduction, and flow construction simulation of the project, so that the layout can be quickly carried out during construction, indirectly saving more than 10 days of construction time.
4. During the implementation of the project, three-dimensional disclosure was carried out through various construction process simulations and complex node process simulations, which improved the construction implementation efficiency and quality control.
5. BIM technology was used in this project to design the comprehensive layout of pipeline-intensive areas, and to detect collisions and conflicts at the construction site in advance.
6. Through BIM+ assembly design, the efficiency was increased by more than two times, saving more than 20 days in the deepening design cycle.
7. Digital guiding rule and other hand-held intelligent measuring equipment were used to carry out the actual measurement work, improving the accuracy of the measurement and ensure the authenticity and effectiveness of measurement data. Intelligent construction elevator was installed to monitor and warn its operation status in real time to ensure the safe operation of equipment. The building cleaning robot is introduced to clean the indoor and outdoor flat ground of the project, so as to reduce the labor input and control the dust on the site.